The road taken by this box of biscuits was followed by every ton
of supplies required by 10,000 men in the field. The uninterrupted working
of the long and varied chain was vital to the welfare of the army and the
success of the war. It could only be maintained if every section was
adequately supplied and none were either choked or starved. This problem
had to be solved correctly every day by the transport officers, in spite
of uncertain winds that retarded the boats, of camels that grew sick or
died, and of engines that repeatedly broke down. In the face of every
difficulty a regular supply was maintained. The construction of the railway
was not delayed, nor the food of the troops reduced.
The line continued to grow rapidly, and as it grew the difficulties of
supply decreased. The weight was shifted from the backs of the camels and
the bottoms of the sailing-boats to the trucks of the iron road. The strong
hands of steam were directed to the prosecution of the war, and the
swiftness of the train replaced the toilsome plodding of the caravan.
The advance of the Dervishes towards Berber checked the progress of the
railway. Military precautions were imperative. Construction was delayed by
the passage of the 1st British Brigade from Cairo to the front, and by the
consequently increased volume of daily supplies. By the 10th of March,
however, the line was completed to Bashtinab.