Work was
at once resumed with renewed energy. The pace of construction now became
remarkable. As much as 5,300 yards of track was surveyed, embanked,
and laid in a single day. On the 1st of November Abu Hamed was reached,
and by the banks of the Nile the men who had fought their way across the
desert joined hands with those who had fought their way along the river.
The strain and hardship had not, however, been without effect on the
constructors. Two of the Engineer subalterns--Polwhele and Cator--out of
the eight concerned in the laying of the Dongola and the Desert railways
had died. Their places were eagerly filled by others.
The completion of the line was accelerated by nearly a month through the
fortunate discovery of water. At the beginning of July a well was sunk in
what was thought to be a likely place at 'No. 4 Station,' seventy-seven
miles from Halfa. After five weeks' work water was found in abundance at a
depth of 90 feet. A steam-pump was erected, and the well yielded a
continual supply. In October a second well was sunk at 'No. 6 Station,'
fifty-five miles further on, whence water was obtained in still greater
quantity. These discoveries modified, though they did not solve, the water
question. They substantially increased the carrying capacity of the line,
and reduced the danger to which the construction gangs were exposed.